Preliminary Energy Assessment
Prepared to show how a preliminary bill-backed energy review is structured before any formal proposal or system recommendation.
A simple single-property example showing the bill review, likely options and the checks I would work through before recommending a system.
Illustrative example only. Identifying details are removed and the figures are adjusted for privacy.
Prepared to show how a preliminary bill-backed energy review is structured before any formal proposal or system recommendation.
A practical solar opportunity based on the example bill.
Model a practical solar option against the real daytime load.
Around 10–13 kW only if roof space, export limits and load profile support it.
Test direct solar savings first before adding storage.
Simple steps to get the right solar solution.
Understand when the power is actually being used.
Confirm the physical site can support the design.
Use extra data where it improves the decision.
Compare a standard and larger case.
Proceed only if the numbers stack up.
8–10 kW solar
Recommended starting point
10–13 kW only if the load supports it
Retain if site checks do not support the economics
Not the first step. Solar should be tested first.